COMPLETED PROJECTS
No |
Project Title |
Contract Period |
Client |
Contract Sum (RM) |
01 |
Cement Base stabilisation Project At Kuala Lipis, Pahang |
1 Oct 93 – 30 Dec 93 |
Bumi Highway (M) Sdn Bhd |
1,005,000.00 |
02 |
Pavement construction, East-West Link Expressway Package 5, Kuala Lumpur |
28 May 94 – 30 Feb 95 |
Projek Penyelenggaraan Lebuhraya Berhad |
7,499,628.00 |
03 |
PUTRA Longhouse project (60 units) Phase 1B, Setapak, Kuala Lumpur |
14 Jan 95 – 14 Apr 95 |
Projek Usahasama Transit Ringan Automatic Sdn Bhd |
2,070,601.00 |
04 |
Third lane widening Bangi – Nilai NS Expressway, Selangor |
1 Mar 95 – 30 Sept 95 |
Projek Penyelenggaraan Lebuhraya Berhad |
11,177,462.00 |
05 |
Pavement regulation and repair section N3 and N4, NS Expressway, Kedah |
13 Apr 95 – 12 Dec 95 |
Projek Penyelenggaraan Lebuhraya Berhad |
5,116,800.00 |
06 |
Pavement work for North-South Central Link and KLIA Expressway, package 1A, 1B, 2A, 2A + 2B and 3A, Selangor. |
1 Mar 95 – 14 Apr 97 |
Projek Penyelenggaraan Lebuhraya Berhad |
79,083,458.00 |
07 |
Earthwork, Drainage, Structure and Pavement works for package 10, Middle Ring Road II, Kuala Lumpur |
17 Jun 95 – 31 Oct 97 |
ISYODA (M) Sdn Bhd |
22,851,267.00 |
08 |
Pavement recycling and overlay for Jalan Matang, Kuching |
3 Jul 95 – 31 Dec 95 |
PPES PROGAP Sdn Bhd |
3,645,900.00 |
09 |
Pavement rehabilitation, Senawang – Ayer Keroh and Ipoh – Changkat Jering Expressway, NSE |
July 95 – Dec 95 |
Projek Penyelenggaraan Lebuhraya Berhad |
938,095.00 |
10 |
Protection for fibre optic and TNB cable, Sungai Buloh, Selangor |
Sep 95 -Nov 95 |
Projek Penyelenggaraan Lebuhraya Berhad |
498,950.00 |
11 |
Installation of pipe Culverts at Jalan Choo Cheng Kay to Brickfield Kuala Lumpur |
19 Oct 95 – 31 Aug 96 |
Dewan Bandaraya Kuala Lumpur |
4,408,280.00 |
12 |
Malaysia Singapore Second Crossing Project, Johor |
22 July 96 – 31 Dec 97 |
Linkedua (M) Sdn Bhd |
39,013,448.00 |
13 |
Kuala Perlis to Changlun Road Project on Design and Build, Perlis |
15 Aug 97 – 14 Aug 2000 |
JKR Malaysia (JV with Isyoda (M) Sdn Bhd.) |
167,263,230.00 |
14 |
Construction and completion of civil works at Putrajaya Upper North Wetland at CH 20780 to CH 22180 |
Oct 97 – Dec 99 |
Trac JV |
3,017,215.00 |
15 |
Proposed pavement upgrading at 8 no. Rest & Service Area along the North South Expressway |
10 Nov 97 – 23 Feb 98 |
Projek Lebuhraya Utara Selatan |
1,679,189.00 |
16 |
Proposed pavement upgrading at 26 no. Laybys along the North-South Expressway Package 3B |
5 Jan 98 – 4 Jul 98 |
Projek Lebuhraya Utara Selatan Bhd. |
387,440.00 |
17 |
The maintenance of North South Expressway (Central Region) Selangor |
16 Feb 98- 31 Dec 99 |
Projek Penyelenggaraan Lebuhraya Berhad |
1,946,765.00 |
18 |
Pusat Pentadbiran Kerajaan Persekutuan Putrajaya – The construction and completion of Southern Inner Ring Road (Phase 1A – Package R8A) Selangor |
7 Jun 98 – 7 Sept 98 |
Kamunting Construction Sdn Bhd |
3,085,216.00 |
19 |
Proposed pavement rehabilitation and associated works along Simpang Ampat – Pagoh Expressway (Package F), Melaka |
13 Jul 98 – 2 Nov 98 |
Projek Penyelenggaraan Lebuhraya Bhd |
2,258,307.00 |
20 |
Proposed pavement upgrading works (Porous Asphalt) on accident prone areas along North South Expressway (Phase 4 Package 4A & C) Johor & Kedah |
24 Aug 98 – 31 Oct 98 |
Projek Lebuhraya Utara Selatan |
1,255,682.00 |
21 |
Development of Putrajaya Bridge BR10 (Drainage and pavement works) Selangor |
15 Sept 98 – 30 Jan 99 |
Peremba Construction Sdn Bhd |
880,655.00 |
22 |
Proposed pavement rehabilitation works along Ipoh-Changkat Jering Expressway (Package G2B), Perak |
16 Nov 98 – 17 Dec 98 |
Projek Penyelenggaraan Lebuhraya Berhad |
698,000.00 |
23 |
North South Expressway Central Link & KLIA Expressway Package 3D-2 : Construction of elevated Via duct, Selangor. |
24 Feb 99 – 15 Nov 99 |
UE Construction Sdn Bhd |
41,615,349.00 |
24 |
Proposed pavement rehabilitation and associated works at KM 0.00 – KM 14.00 Kempas – Skudai Expressway (Phase 1A) Johor |
15 Mac 99 – 27 Sept 99 |
Projek Penyelenggaraan Lebuhraya Berhad |
5,469,402.00 |
25 |
North South Expressway Central Link & KLIA Expressway Section 3D Putrajaya Interchange and Link road pavement work, Selangor |
15 May 99 – 20 Dec 99 |
Hasrat Usaha Sdn Bhd |
4,937,281.00 |
26 |
2 Block of 9 Storey Hostel for Kumpulan Ikram Sdn Bhd, Selangor. |
9 Aug 99 – 15 Nov 2000 |
Kumpulan Ikram Sdn Bhd |
16,069,442.00 |
27 |
The execution and completion of pavement, road kerbs and road furniture to Road MH01 part of Precinct 16, Development at Putrajaya, Selangor |
13 Oct 99 – 25 Jan 2000 |
Senandung Budiman Sdn Bhd |
1,632,679.00 |
28 |
Express Rail Link Kuala Lumpur – KLIA Project, for earthwork and associated works – Sector 3.3 Part 3, Selangor |
15 Dec 99 – 14 Jun 2000 |
YTL Civil Engineering Sdn Bhd |
6,457,920.00 |
29 |
Proposed pavement rehabilitation works at KM 275.00 to km 339.30 both bound, Section C1, Perak |
20 Mac 2000 1 Sept 2000 |
Projek Penyelenggaraan Lebuhraya Berhad |
3,973,936.00 |
30 |
Road Projects in Parliament area of Telok Kemang, Port Dickson, Negeri Sembilan |
25 May 2000 23 Aug 2000 |
Jabatan Kerja Raya Malaysia |
7,000,000,00 |
31 |
Proposed pavement rehabilitation works along Senai-Johor Bahru KM 0.00 – KM 27.55 BB Section S5, Johor |
7 Aug 2000 – 5 Jan 2001 |
Projek Penyelenggaraan Lebuhraya Berhad |
2,774,545.00 |
32 |
Rehabilitation and upgrade of road in Parliament area of Lunas, Kedah |
1 Dec 2000- 3 Mar 2001 |
Jabatan kerja Raya Malaysia |
9,854,156.00 |
33 |
Road upgrading at Merbok, Kedah |
May 01 – Nov 01 |
Menuju Asas Sdn Bhd |
4,074,000.00 |
34 |
Pavement works at Gua Musang, Kelantan |
Jun 01 – Nov 01 |
MKJ Construction |
5,432,615.00 |
35 |
Pavement works at Special Service Group Camp, Phase 1, Mersing, Johor |
1 Aug 01 – 31 Oct 03 |
Muhibbah Engineering (M) Bhd |
11,213,093.10 |
36 |
Pavement works at Dungun, Terengganu |
Oct 01 – Nov 01 |
HESB Corporation Sdn Bhd |
2,191,408.00 |
37 |
Construction and Project Management for the Construction, Equipping, Commissioning & Maintenance of The Proposed 76 Bedded Hospital at Lot 2237, Jasin, Melaka |
16 Oct 01 – 15 Oct 03 |
Pembinaan Bumiasia Sdn Bhd/Bumiasia-Profil JV Sdn Bhd |
50,000,000.00 |
38 |
Pavement works at Bukit Sagu, Pahang |
Nov 01 – Jun 02 |
Ciptera Engineering Sdn Bhd |
2,773,471.00 |
39 |
Pavement woks at Kemaman, Terengganu |
Mar 02 – Jun 02 |
HESB Corporation Sdn Bhd |
1,451,101.00 |
40 |
Pavement works at Gua Musang, Kelantan |
Mar 02 – Jun 02 |
MKJ Construction |
1,443,479.00 |
41 |
Proposed pavement rehabilitation and associated works along Expressway Lingkaran Tengah, Package 1 km 22.00 to km 30.00 Southbound. |
18 Nov 2002- 11 May 2003 |
Expressway Lingkaran Tengah Sdn Bhd |
2,874,400.00 |
42 |
Proposed pavement rehabilitation and associated works along Expressway Lingkaran Tengah, Package 1 km 18.00 to km 26.00 Northbound. |
18 Nov 2002- 11 May 2003 |
Expressway Lingkaran Tengah Sdn Bhd |
2,874,400.00 |
43 |
Upgrading and rehabilitation of Federal Route 5 – Kapar – Sabak Bernam & Klang – Banting, Selangor Darul Ehsan (Phase A) |
20 Dec 1999 – 19 Dec 2002 |
Jabatan Kerja Raya Malaysia (JV with TH-Technologies Sdn Bhd.) |
249,399,360.39 |
44 |
Pavement works for Periodic Maintenance works 2003. Proposed Rehabilitation of Federal Route 2, Section 26.00 – 33.90, District Petaling, Selangor Darul Ehsan (In relation to the Maintenance of Federal Roads in Peninsular Malaysia) |
17 Mar 03 – 16 Nov 03 |
Kostima Construction Sdn Bhd |
6,508,656.00 |
45 |
The Execution and Completion of Premix, Road Marking, Guardrail, Road Signages, Entrance Signage and Padang Kawad – Section A2 for Proposed Army Training Centre, Phase 2, Gemas, Negeri Sembilan for Ministry of Defence (Package No. INF/36,37, 40 & 43) |
28 May 03 – 27 Nov 03 |
TH Technologies Sdn Bhd |
3,023,778.83 |
46 |
The Execution and completion of Premix, Road Marking, road Signage, Turfing and Ancillary Works for Sector D for Proposed Army Training Centre, Phase 2, Gemas, Negeri Sembilan for Ministry of Defence (Package No. : INF/36(a)). |
1 Aug 03 – 30 Nov 03 |
TH Technologies Sdn Bhd |
2,780,000.00 |
47 |
Pavement Works for Periodic Maintenance Works 2004. Proposed Rehabilitation of Federal Route 08, Section 173.00-176.00 (Jln. Lipis-Gua Musang), Lipis, Pahang Darulmakmur” (In Relation to the Maintenance of Federal Roads in Peninsular Malaysia) |
16 June 2004 – 10 July 20004 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
541,921.60 |
48 |
Pavement Works (CIPR) for Periodic Maintenance Works 2004. Proposed Rehabilitation Federal Route 08, Jln.Teranum Bypass, Bentong, Pahang Darulmakmur” (In Relation to the Maintenance of Federal Roads in Peninsular Malaysia) |
16 July 2004 – 16 Sept 2004 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
895,737.40 |
49 |
Pavement Works for Periodic Maintenance Works 2004. Proposed Rehabilitation of Federal Route 63, Section 69.00-72.80 & 59.00 – 66.00, Rompin, Pahang Darulmakmur” |
27 July 2004 – 23 Sept 2004 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
932,745.01 |
50 |
Pavement Works for Periodic Maintenance Works 2004. Proposed Rehabilitation of Federal Route 08, Section 163.00-164.00 (Jln. Lipis – Gua Musang), Lipis, Pahang Darulmakmur” (In Relation to the Maintenance of Federal Roads in Peninsular Malaysia) |
15 May 2004 – 30 June 2004 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
122,917.20 |
51 |
Pavement Works (HIPR) for Periodic Maintenance Works 2004. Proposed Rehabilitation of Federal Route 02, Section 120.00 – 125.00, Temerloh, Pahang Darulmakmur” (In Relation to the Maintenance of Federal Roads in Peninsular Malaysia) |
7 Oct 2004 – 5 Nov 2004 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
343,650.00 |
52 |
Pavement Works for Periodic Maintenance Works. Proposed Rehabilitation of Federal Route 1563, Jln. Felda Lepar Hilir, Kuantan, Pahang Darulmakmur” (In Relation to the Maintenance of Federal Highway Roads in Peninsular Malaysia) |
26 Nov 2004 – 24 Jan 2005 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
847,197.00 |
53 |
Pavement Works for Periodic Maintenance Works 2005. Proposed Rehabilitation of Federal Route 02, Section 196.00-218.00,Temerloh, Pahang Darulmakmur” (In Relation to the Maintenance of Federal Roads in Peninsular Malaysia) |
14 Feb 2005 – 25 March 2005 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
1,214,331.00 |
54 |
Pavement Works for Periodic Maintenance Works 2005. Proposed Cold-In-Place Recycling (CIPR) Works At Route 3218, Section 8.00-11.70, Jln. Pandamaran, Daerah Klang, Selangor. (In Relation to the Maintenance of Federal Roads in Peninsular Malaysia) |
28 Feb 2005 – 30 April 2005 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
1,081,451.00 |
55 |
Upgrading and rehabilitation of Federal Route 5 – Kapar – Sabak Bernam & Klang – Banting, Selangor Darul Ehsan (Phase B) |
8 June 2001 – 31 Oct 2005 |
Jabatan Kerja Raya Malaysia (JV with TH-Technologies Sdn Bhd.) |
328,466,139.60 |
56 |
Upgrading of road from Utan Aji, Perlis to Changlun, Kedah |
3 Sept 2001 – 15 Sept 2005 |
Jabatan Kerja Raya Malaysia (JV with Konsortium Indera S/B) |
180,883,643.00 |
57 |
Upgrading of Kuching to Serian road (Km 24 to Km 60, Serian) Sarawak |
3 Sept 2001 – 31 Oct 2005 |
Jabatan Kerja Raya Malaysia (JV with Endaya Const.S/B) |
167,660,086.46 |
58 |
Design, construct and completion of upgrading and rehabilitation of Muar-Melaka-Alor Gajah-Simpang Ampat road. |
9 April 2001 – 30 April, 2007 |
Jabatan Kerja Raya Malaysia (JV with TH-Technolgies Sdn Bhd.) |
505,638,075.30 |
59 |
Construction of road from Simpang Pulai-Loging-Gua Musang-Kuala Berang (Pakej 5 : From Chiku to Aring) |
2 Jan 2004 – 31 Jan 2007 |
Jabatan Kerja Raya Malaysia (JV with TH-Technologies Sdn Bhd.) |
114,854,158.94 |
60 |
Pavement Rehabilitation and Associated Works (Package 5A, 5B, 6A & 6B) of Kuala Lumpur-Karak Highway |
21 Feb 2005 – 24 April 2007 |
Alloy Maintenance Engineering Sdn Bhd |
21,575,595.90 |
61 |
Six (6) Bridges Maintenances at Sirt, Libya |
28th May 2006 to 27th May 2007 |
General Company of Roads & Bridges, Libya (GCRB) |
8,688,657.04 |
62 |
Maintenance Works for Coastal Road, Ras Ejdir – Garabulli, Libya. |
May 2006 – Oct 2007 |
General Company of Roads & Bridges, Libya (GCRB) |
21,530,088.00 |
63 |
Proposed Infrastructure and Related Works for the Construction of Institute of Teacher Training College, Pulau Pinang, Mukim 13 Daerah Timur Laut, Pulau Pinang – Phase 1 |
Sept 2007 to Nov 2009 |
Ministry of Education |
12,400,000.00 |
64 |
Pavement work (Cold in Place Recycling) at route FT 181, Section 1.40 – 2.75 & 1.85 – 3.00, Lebuhraya Pulau Indah, Daerah Klang |
15 Jan 2009 – 29 Feb 2009 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
1,288,061.24 |
65 |
Pavement (Cold in Place Recycling) at Section0.200 – 3.400 and Section 4.600 – 7.000, Jalan Hamzah Alang, District Klang, Selangor Darul Ehsan. |
2 Apr 2009 – 25 Jun 2009 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
3,367,499.33 |
66 |
Pavement works (Cold in Place Recycling) at Route FT 09, Jalan Karak Pelangai Section 113.00 – 116.65, District Bentong, Pahang Darul Makmur |
July 2009 – Oct 2009 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
1,899,495.36 |
67 |
Pavement works (Cold in Place Recycling) for perodic maintenance works 2009 at Route FT 2489 Melati District of Rompin, Pahang |
3 Nov 2009 – 4 Dec 2009 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
1,045,257.88 |
68 |
Pavement Works CIPR Route FT 1743, Sec 2.3-8.8, Jalan Felda Aring 8 & 9, Jajahan Gua Musang, Kelantan Darul Naim |
Oct 2009 – Nov 2009 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
838,456.47 |
69 |
Pavement works (Cold in Place Recycling) for perodic maintenance works 209 at Route FT 1503 section 9.68- Section 12.18, Jalan Utama Felda Sg. Koyan District of Lipis, Pahang Darul Makmur |
Aug 2009 – Nov 2009 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
1,227,075.05 |
70 |
Pavement (Cold in Place Recycling) at Route FT 1570, Section 12.00 – Section 17.00, Jalan Utama Lepar Hilir 3, District of Kuantan, Pahang |
7 Nov 2009 – 13 Dec 2009 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
1,801,175.00 |
71 |
Pavement (Cold in Place Recycling) at FT 1271, Section 0.00 – Section 2.50 Jalan Utama Felda Tembangau, District of Bera |
3 Nov 2009 – 4 Dec 2009 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
975,888.95 |
72 |
Pavement (Cold in Place Recycling) at FT 2686, Section 2 – 28, Jalan Mak Lagam, Kemaman, Terengganu |
May 2009 – March 2010 |
Jabatan Kerja Raya Malaysia/Roadcare (M) Sdn Bhd. |
10,477,735.77 |
73 |
Landslide repair and slope strenghtening at Taman Bukit Mewah, Bukit Antarabangsa, Ulu Kelang, Selangor (Build & Design) – Package 1 |
23 Mar 2009 to 2 Sept 2010 |
Ministry of Works |
10,300,000.00 |
74 |
Proposed Construction and Completion of Institute of Teacher Training College, Pulau Pinang, Mukim 13 Daerah Timur Laut, Pulau Pinang – Phase 2 |
IPPPP – 31 October 2011 |
Malaysian Ministry of Education |
36,100,000.00 |
75 |
Cadangan Pembangunan Perumahan Untuk 1100 Unit Perumahan Penjawat Awam Malaysia (PPAM) Saderi Di Atas Plot 16-R1 dan Plot 16-P1, P.T. 12217, Presint 16, Wilayah Persekutuan Putrajaya, Malaysia |
15 July 2017 – 2020 |
Protasco Development Sdn. Bhd |
246,753,500.00 |
76 |
Part 1 – Improvement of Road From Kaliakoir Bypass Intersection to Dulla Mari Road (18.00km) from 2-Lane to 4-Lane including Infrastructure. Provision of Support to Project from Third Party Maintenance Quality Check. |
20 August 2015 – August 2018 |
Bangladesh Bridge Authority |
338,829,000.00 |
77 |
Part 2 – Performance-Based Maintenance Works on Improved 4-Lane Roas from Kaliakoir Bypass Intersection to Dulla Mari Road (18.00km). |
20 August 2015 – August 2018 |
Bangladesh Bridge Authority |
5,758,170.00 |
78 |
Cadangan Pembinaan Jalan Penghubung Di Antara Jalan Klang Lama Dan Lebuhraya Pantai Baru (NPE) Melalui Jambatan Menyeberangi Sungai Klang Untuk Tetuan Gapurna Land Sdn Bhd |
01 April 2015 – 31 December 2017 |
Gelanggang Harapan Construction Sdn. Bhd. |
58,000,000.00 |
79 |
Kerja Pembaikan Struktur Sungai Sepanjang 10.7km Sg.Klang Dan Sg Gombak (Jabatan Pengairan Dan Saliran Malaysia) |
17 May 2018 – 16 May 2019 |
Department of Irrigation and Drainage |
31,500,000.00 |